← Back to map

Technical & utility · Vernier

Chemin de Delay 23

EGID 295077134 · Latest year: 2017 · ZIMOGA

Outdated data: the last IDC declaration for this building dates from 2017. It is shown for reference but excluded from statistics.

353
IDC · MJ/m²·yr
481
3-year average
25
Estimated thermal energy · MWh
251
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
353
Peer median
443
Difference
−20.3 %
Percentile
32nd
Zone median
363 (−2.8 %)

In 2017, higher IDC than 32 % of similar buildings. Lower than the peer median.

Peer group: Technical & utility buildings across the canton of Geneva, 2017 (221 buildings).

Trend

−40.6 %
Change over 3 years (2014 → 2017: 594 → 353)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredabove
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

020040060045020112012201420162017
━ Building IDC╌ Peer median
Building type
Technical & utility
Official use
Garage
Main energy carrier
Gas
Industrial zone
ZIMOGA

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Chemin de Delay 23 — IDC heat benchmark · ThermoGeneva