← Back to map

Industrial · Vernier

Chemin de Delay 3

EGID 295097512 · Latest year: 2025 · ZIMOGA

230
IDC · MJ/m²·yr
208
3-year average
99
Estimated thermal energy · MWh
1'550
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
230
Peer median
318
Difference
−27.7 %
Percentile
26th
Zone median
278 (−17.3 %)

Higher IDC than 26 % of similar buildings. Lower than the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2025 (333 buildings).

Trend

+39.4 %
Change over 3 years (2022 → 2025: 165 → 230)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500450201120122014201620182020202220242025
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Atelier
Main energy carrier
Heating oil
Industrial zone
ZIMOGA

IDC × SRE, climate-normalised: heating and hot water only, not process energy.