Industrial · Vernier
Chemin Grenet 21
EGID 295511596 · Latest year: 2024 · ZIMOGA
173
IDC · MJ/m²·yr
194
3-year average
1'330
Estimated final energy · MWh
27'674
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 173
- Peer median
- 338
- Difference
- −48.7 %
- Percentile
- 17th
- Zone median
- 284 (−39.1 %)
Higher IDC than 17 % of similar buildings. Lower than the peer median.
Peer group: Industrial buildings across the canton of Geneva, 2024 (376 buildings).
Trend
−16.0 %
Change over 3 years (2021 → 2024: 206 → 173)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Autre bât. d'activités
- Main energy carrier
- Heat pump electricity (after 5 Aug 2010)
- Industrial zone
- ZIMOGA
IDC × SRE, climate-normalised: heating and hot water only, not process energy.
For heat pumps the IDC counts electricity used, which lowers the value compared with fuel-based systems.