Offices · Satigny
Rue de la Bergère 7
EGID 295518719 · Latest year: 2025 · ZIMEYSA
585
IDC · MJ/m²·yr
564
3-year average
1'959
Estimated thermal energy · MWh
12'054
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 585
- Peer median
- 312
- Difference
- +87.8 %
- Percentile
- 94th
- Zone median
- 315 (+86.0 %)
Higher IDC than 94 % of similar buildings. Higher than the peer median — may warrant further assessment.
Peer group: Offices buildings across the canton of Geneva, 2025 (644 buildings).
Trend
+93.7 %
Change over 3 years (2022 → 2025: 302 → 585)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredabove
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Offices
- Official use
- Bureaux
- Main energy carrier
- Gas
- Industrial zone
- ZIMEYSA
IDC × SRE, climate-normalised: heating and hot water only, not process energy.