Route du Nant-d'Avril 148
EGID 295521014 · Latest year: 2026 · ZIMEYSA
Compared with similar buildings
- IDC
- 79
- Peer median
- 311
- Difference
- −74.6 %
- Percentile
- 3rd
- Zone median
- 305 (−74.1 %)
Higher IDC than 3 % of similar buildings. Lower than the peer median.
Peer group: Industrial buildings across the canton of Geneva, 2026 (65 buildings).
Trend
Not enough history for a 3-year comparison.
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures required3-year average not available
- 800 — significant (until 2026)3-year average not available
- 650 — significant (from 2027)3-year average not available
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Autre bât. d'activités
- Main energy carrier
- Heat pump (heat metering)
- Industrial zone
- ZIMEYSA
IDC × SRE, climate-normalised: heating and hot water only, not process energy.
For heat pumps the IDC counts electricity used, which lowers the value compared with fuel-based systems.