← Back to map

Technical & utility · Vernier

Chemin de Delay 50

EGID 9082377 · Latest year: 2025 · ZIMOGA

312
IDC · MJ/m²·yr
—
3-year average
128
Estimated thermal energy · MWh
1'473
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
312
Peer median
387
Difference
−19.4 %
Percentile
28th
Zone median
278 (+12.2 %)

Higher IDC than 28 % of similar buildings. Lower than the peer median.

Peer group: Technical & utility buildings across the canton of Geneva, 2025 (149 buildings).

Trend

Not enough history for a 3-year comparison.

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures required3-year average not available
  • 800 — significant (until 2026)3-year average not available
  • 650 — significant (from 2027)3-year average not available

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500600450201120122014201620242025
━ Building IDC╌ Peer median
Building type
Technical & utility
Official use
Garage
Main energy carrier
Heat pump (electricity consumed)
Industrial zone
ZIMOGA

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

For heat pumps the IDC counts electricity used, which lowers the value compared with fuel-based systems.

Chemin de Delay 50 — IDC heat benchmark · ThermoGeneva